Accepted by Sam Whitlock — contract raised
Carry on from the job — it's linked above.
Linescost, sell and margin per line — totals recalculate as you edit
| Type | Description | Qty | Unit sell | Total | Margin |
|---|---|---|---|---|---|
| Design | Mechanical design, 3D drafting & shop drawings | 1 | $59,011.00 | $59,011.00 | 20.0% |
| Equipment | Mechanical plant & equipment (per schedule) | 1 | $424,876.00 | $424,876.00 | 16.7% |
| Fan | FBA In-line Centrifugal 450 backward inclined — EF-14-01 Toilet exhaust fan | 1 | $5,790.00 | $5,790.00 | 14.8% |
| Ductwork | Ductwork manufacture (Parramatta) & install | 1 | $200,636.00 | $200,636.00 | 23.5% |
| Labour | Site installation labour & supervision | 1 | $295,053.00 | $295,053.00 | 20.0% |
| Subcontract | BMS / controls & electrical | 1 | $141,625.00 | $141,625.00 | 16.7% |
| Commissioning | Testing, balancing & commissioning, O&M manuals | 1 | $59,009.00 | $59,009.00 | 20.0% |
Harvey Air ConditioningAccepted
- Customer
- Built Pty Ltd
- Prepared by
- Rowan Kennedy
- Issued
- 23 May 2026
- Valid until
- 22 Jun 2026
- Accepted
- 10 Jun 2026 · 10:00 · Sam Whitlock
Cost$960,902.09 Sell (ex GST)$1,186,000.00 GST$118,600.00 Total inc GST$1,304,600.00
Margin 19.0% $225,098
Harvey Air Conditioning Pty Ltd · Harvey Air Conditioning
Cnr Macarthur & Fennell Sts, Parramatta NSW 2150 · (02) 9630 5100 · air@harveyind.com.au
ABN 42 000 473 334 · ARCtick AU10031
Quotation
HAC-Q2641
Date 23 May 2026
Valid until 22 Jun 2026
Prepared by Rowan Kennedy
Quotation to
Built Pty Ltd
Attn: Sam Whitlock
sam@built.com.au
Sydney NSW
ABN 56 440 190 456
For
Parramatta Square 6 — Levels 14–16 fitout6 Parramatta Sq, Parramatta
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Mechanical design, 3D drafting & shop drawings | 1 | $59,011.00 | $59,011.00 |
| Mechanical plant & equipment (per schedule) | 1 | $424,876.00 | $424,876.00 |
| FBA In-line Centrifugal 450 backward inclined — EF-14-01 Toilet exhaust fan | 1 | $5,790.00 | $5,790.00 |
| Ductwork manufacture (Parramatta) & install | 1 | $200,636.00 | $200,636.00 |
| Site installation labour & supervision | 1 | $295,053.00 | $295,053.00 |
| BMS / controls & electrical | 1 | $141,625.00 | $141,625.00 |
| Testing, balancing & commissioning, O&M manuals | 1 | $59,009.00 | $59,009.00 |
| Subtotal (ex GST) | $1,186,000.00 |
| GST 10% | $118,600.00 |
| Total (inc GST) | $1,304,600.00 |
Prices in AUD, GST shown separately. Valid 30 days. Subject to Harvey Air Conditioning standard terms of contract.
Emails & activity · 3
↗ Re: Quotation HAC-Q2641 — Parramatta Square 6 — Levels 14–16 fitout HAC synced 10 Jun 2026 · 16:10
From Rowan Kennedy <rkennedy@harveyind.com.au> · To Sam Whitlock <sam@built.com.au>
Thanks Sam — appreciated. Greg Pollard will be your project manager and will be in touch this week.
Rowan Kennedy↙ Re: Quotation HAC-Q2641 — Parramatta Square 6 — Levels 14–16 fitout HAC synced 10 Jun 2026 · 10:00
From Sam Whitlock <sam@built.com.au> · To Rowan Kennedy <rkennedy@harveyind.com.au>
Hi Rowan,
Pleased to confirm we're proceeding — letter of award to follow from our contracts team. Please send your program and shop drawing schedule.
Sam Whitlock↗ Quotation HAC-Q2641 — Parramatta Square 6 — Levels 14–16 fitout HAC sent 23 May 2026 · 14:34
From Rowan Kennedy <rkennedy@harveyind.com.au> · To Sam Whitlock <sam@built.com.au>
Hi Sam,
Please find attached our quotation HAC-Q2641 for Parramatta Square 6 — Levels 14–16 fitout — $1,186,000 + GST, valid 30 days.
Happy to walk through it.
Regards,
Rowan Kennedy