1
Enquiry
direct order
✓
Quote
✓
Invoices
5
Look after it
not yet
Next step
Move it to Folding & forming when the shop gets there
All material reserved. 27 shop hours estimated.
✓
Released
✓
Drawing & nesting
3
CNC plasma
4
Folding & forming
5
Welding & assembly
6
QA & dispatch
7
Dispatched
JobHarveys NewcastleCNC plasma
- Workshop
- Harveys Newcastle — 16 Parker St, Carrington
- For contract
- HN-J0412 University of Newcastle Medical Sciences — level 3 refurbishment · order HN-J0412
- Type
- Ductwork
- Material
- Stainless 304, 1.6 mm
- Size
- 67 m²
- Drawing
- HN-DWG-1995 rev B
- Due
- 12 Oct 2026
Value
Charged to the contract$9,280.00 Materials (stores cost)$6,715.00 Shop hours (est.)27 h Standard cost$9,280.00 Margin$0 · 0%
Materialsreserved against this job
| Part | Description | Bin | Qty | On hand | Cost | Status |
|---|---|---|---|---|---|---|
| DUCT-FLANGE | TDC duct flange 30mm | Duct shop | 37 m | 2842 | $155 | In stock |
| DUCT-INSUL | Duct insulation 25mm foil-faced | Insulation bay | 67 m2 | 5041 | $657 | In stock |
| DUCT-SEAL | Duct sealant 600ml | Duct shop | 4 ea | 328 | $46 | In stock |
| RIVETS | Blind rivets 4.8mm (box 500) | Duct shop | 2 box | 119 | $52 | In stock |
| SS304-1.6 | Stainless 304 1.6mm 2400×1200 | SS rack | 27 sheet | 79 | $5,805 | In stock |
Harveys Newcastle Pty Ltd · Harveys Newcastle
16 Parker St, Carrington NSW 2294 · (02) 4961 6261 · general@harveysnewcastle.com.au
ABN 63 000 792 638 · ARCtick AU
Job card
HNF-2622
Date 25 Sep 2026
Due 12 Oct 2026
Drawing HN-DWG-1995 rev B
For
HN-J0412 University of Newcastle Medical Sciences — level 3 refurbishment
Order HN-J0412
| Job | Fume exhaust (SS 304) — HN-J0412 |
| Type | Ductwork |
| Material | Stainless 304, 1.6 mm |
| Size | 67 m² |
| Workshop | Carrington |
Emails & activity · 0
No correspondence yet.