BarcodeSiteAssetMakeModelSerialLocationFrequencyNext dueStatus
HA-004175 Fox Hills Clubhouse Split system Daikin FTXV 6962638 Meeting room 7 Six-monthly 21 Sep 2026 Overdue Operational
HA-004174 Fox Hills Clubhouse Split system Daikin FTXV 5192462 Meeting room 11 Six-monthly 25 Sep 2026 Overdue Operational
HA-004151 Burwood RSL Cooling tower BAC VTL 7313997 Plantroom Monthly 28 Sep 2026 Overdue Operational
HA-004237 Mega Mall Auburn Cooling tower BAC — 1016140 Plantroom #1 Monthly 28 Sep 2026 Overdue Operational
HA-004118 Cabravale Leisure Centre Split system Mitsubishi PKA-M100 5514840 Meeting room 10 Six-monthly 29 Sep 2026 Overdue Operational
HA-004302 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 9538376 Wing B room 2 Annual 29 Sep 2026 Overdue Operational
HA-004303 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 1579126 Room 5 Annual 29 Sep 2026 Overdue Operational
HA-004304 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 5695747 Ensuite 33 Annual 29 Sep 2026 Overdue Operational
HA-004117 Cabravale Leisure Centre Split system Mitsubishi PKA-M100 1143739 Level 1 — office 15 Six-monthly 03 Oct 2026 Overdue Operational
HA-004149 Burwood RSL Chiller Carrier 30XA-302 8339342 Plantroom #1 Monthly 09 Oct 2026 Scheduled Monitor
HA-004213 Marian Nursing Home Split system Mitsubishi MSZ-AP 2290698 Level 2 — office 17 Six-monthly 09 Oct 2026 Scheduled Operational
HA-004247 Mega Mall Auburn Carpark exhaust fan FBA S1000-DWDI-900 FBA-20-0954 Roof — north #1 Six-monthly 09 Oct 2026 Scheduled Operational
HA-004357 Glendale Shopping Centre Chiller Carrier 30XA-252 3038597 Plantroom Monthly 09 Oct 2026 Scheduled Operational
HA-004375 Wests New Lambton Package unit Temperzone OPA 1200 2288677 Level 2 plant #4 Quarterly 10 Oct 2026 Scheduled Operational
HA-004276 75 Castlereagh St AHU Air Change AHU 8668603 Mezzanine #2 Quarterly 11 Oct 2026 Scheduled Operational
HA-004359 Glendale Shopping Centre AHU Air Change AHU 1380610 Plant room 1 Quarterly 11 Oct 2026 Scheduled Operational
HA-004362 Glendale Shopping Centre AHU Air Change AHU 6706853 Roof #5 Quarterly 11 Oct 2026 Scheduled Operational
HA-004185 Seven Hills RSL Kitchen exhaust fan FBA ILC-630 FBA-15-0576 Roof #1 Quarterly 12 Oct 2026 Scheduled Operational
HA-004285 20 Smith St Parramatta Chiller (Powerpax) Powerpax centrifugal 8039105 Plantroom Monthly 12 Oct 2026 Scheduled Operational
HA-004329 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 9023634 Wing A room 7 Annual 12 Oct 2026 Scheduled Operational
HA-004373 Wests New Lambton Package unit Temperzone OPA 1200 4066206 Level 2 plant #2 Quarterly 12 Oct 2026 Scheduled Operational
HA-004181 Seven Hills RSL Package unit Temperzone OPA 1200 2166073 Roof #1 Quarterly 13 Oct 2026 Scheduled Operational
HA-004214 Marian Nursing Home Split system Mitsubishi MSZ-AP 8786244 Level 2 — office 16 Six-monthly 13 Oct 2026 Scheduled Operational
HA-004253 Stamford Marque Split system (common) Fujitsu ASTG 2749971 Level 2 — office 11 Six-monthly 13 Oct 2026 Scheduled Operational
HA-004287 20 Smith St Parramatta Cooling tower Aquacool — 9444262 Plantroom #2 Monthly 13 Oct 2026 Scheduled Operational
HA-004368 Junction Fair Package unit Temperzone OPA 960 7443011 Level 2 plant #4 Quarterly 13 Oct 2026 Scheduled Operational
HA-004194 Ettalong Diggers Fan coil unit Daikin FXFQ 1270895 Room 9 Six-monthly 14 Oct 2026 Scheduled Operational
HA-004217 Marian Nursing Home Split system Mitsubishi MSZ-AP 4078375 Meeting room 8 Six-monthly 14 Oct 2026 Scheduled Operational
HA-004277 75 Castlereagh St AHU Air Change AHU 2039276 Level 2 plant #3 Quarterly 15 Oct 2026 Scheduled Operational
HA-004282 75 Castlereagh St AHU Air Change AHU 7677681 Roof #8 Quarterly 15 Oct 2026 Scheduled Operational
HA-004291 20 Smith St Parramatta AHU Air Change AHU 4616797 Roof #4 Quarterly 15 Oct 2026 Scheduled Operational
HA-004310 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 4831409 Wing B room 4 Annual 15 Oct 2026 Scheduled Operational
HA-004100 Fairfield Leisure Centre Chiller Carrier 30RB-262 7773359 Plantroom Monthly 16 Oct 2026 Scheduled Operational
HA-004120 Fairfield Council Administration Centre Chiller Daikin EWAD-TZ 1682785 Plantroom #2 Monthly 16 Oct 2026 Scheduled Operational
HA-004234 Royal Rehab Ryde Hydrotherapy pool exhaust FBA S1000-SWSI-560-AL FBA-16-0703 Roof — north Quarterly 17 Oct 2026 Scheduled Operational
HA-004294 Parramatta South — Building EA Chiller Daikin EWAD 5926908 Plantroom Monthly 17 Oct 2026 Scheduled Operational
HA-004161 Burwood RSL Fan coil unit Temperzone FCU 7075425 Room 6 Six-monthly 18 Oct 2026 Scheduled Operational
HA-004245 Mega Mall Auburn AHU Harvey custom AHU 6745409 Mezzanine #7 Quarterly 18 Oct 2026 Scheduled Operational
HA-004180 Fox Hills Clubhouse Kitchen exhaust fan FBA ILC-560 FBA-17-0540 Carpark B1 Quarterly 19 Oct 2026 Scheduled Operational
HA-004235 Mega Mall Auburn Chiller Carrier 30XW 9707944 Plantroom #1 Monthly 19 Oct 2026 Scheduled Operational
HA-004236 Mega Mall Auburn Chiller Carrier 30XW 5094509 Plantroom #2 Monthly 19 Oct 2026 Scheduled Operational
HA-004260 Piccadilly Tower L15–17 Water-cooled packaged unit Temperzone WCP 9429909 Roof #3 Quarterly 19 Oct 2026 Scheduled Operational
HA-004154 Burwood RSL AHU Harvey custom AHU 9568520 Mezzanine #3 Quarterly 20 Oct 2026 Scheduled Operational
HA-004189 Ettalong Diggers VRF condenser Daikin VRV IV RXYQ 4660116 Roof #3 Quarterly 20 Oct 2026 Scheduled Operational
HA-004258 Piccadilly Tower L15–17 Water-cooled packaged unit Temperzone WCP 4599448 Plant room 1 Quarterly 20 Oct 2026 Scheduled Operational
HA-004269 Erskine Park Bakery Package unit Temperzone OPA 1500 9481263 Roof #3 Quarterly 20 Oct 2026 Scheduled Operational
HA-004150 Burwood RSL Chiller Carrier 30XA-302 3105381 Plantroom #2 Monthly 21 Oct 2026 Scheduled Operational
HA-004187 Ettalong Diggers VRF condenser Daikin VRV IV RXYQ 6327869 Level 2 plant #1 Quarterly 21 Oct 2026 Scheduled Operational
HA-004198 Ettalong Diggers Fan coil unit Daikin FXFQ 3260181 Level 2 — office 2 Six-monthly 21 Oct 2026 Scheduled Operational
HA-004255 Stamford Marque Split system (common) Fujitsu ASTG 5853946 Room 15 Six-monthly 21 Oct 2026 Scheduled Operational
HA-004262 Piccadilly Tower L15–17 Supplementary DX (comms) Daikin FTXM 1957272 Roof #2 Quarterly 21 Oct 2026 Scheduled Operational
HA-004376 Wests New Lambton Package unit Temperzone OPA 1200 4528039 Level 2 plant #5 Quarterly 21 Oct 2026 Scheduled Operational
HA-004116 Cabravale Leisure Centre Split system Mitsubishi PKA-M100 5872483 Level 2 — office 18 Six-monthly 22 Oct 2026 Scheduled Operational
HA-004156 Burwood RSL AHU Harvey custom AHU 7691583 Level 2 plant #5 Quarterly 22 Oct 2026 Scheduled Operational
HA-004272 75 Castlereagh St Chiller (VSD frictionless) Smardt WC-350 2834359 Plantroom Monthly 22 Oct 2026 Scheduled Operational
HA-004268 Erskine Park Bakery Package unit Temperzone OPA 1500 8208082 Level 2 plant #2 Quarterly 23 Oct 2026 Scheduled Operational
HA-004307 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 8971273 Wing B room 19 Annual 23 Oct 2026 Scheduled Operational
HA-004259 Piccadilly Tower L15–17 Water-cooled packaged unit Temperzone WCP 1033444 Mezzanine #2 Quarterly 24 Oct 2026 Scheduled Operational
HA-004286 20 Smith St Parramatta Cooling tower Aquacool — 3881086 Plantroom #1 Monthly 24 Oct 2026 Scheduled Operational
HA-004297 Parramatta South — Building EA AHU Air Change AHU 5091944 Roof #3 Quarterly 24 Oct 2026 Scheduled Operational
HA-004338 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 3258488 Ensuite 24 Annual 25 Oct 2026 Scheduled Operational
HA-004163 Burwood RSL Fan coil unit Temperzone FCU 8864963 Level 1 — office 17 Six-monthly 26 Oct 2026 Scheduled Operational
HA-004274 75 Castlereagh St Cooling tower Aquacool — 9747903 Plantroom #2 Monthly 26 Oct 2026 Scheduled Operational
HA-004210 Marian Nursing Home Split system Mitsubishi MSZ-AP 1033620 Level 2 — office 10 Six-monthly 28 Oct 2026 Scheduled Operational
HA-004273 75 Castlereagh St Cooling tower Aquacool — 6616724 Plantroom #1 Monthly 28 Oct 2026 Scheduled Operational
HA-004238 Mega Mall Auburn Cooling tower BAC — 3661138 Plantroom #2 Monthly 29 Oct 2026 Scheduled Operational
HA-004343 Bupa Baulkham Hills Backflow prevention device Zurn Wilkins RPZ 6818705 Main meter #4 Annual 29 Oct 2026 Scheduled Operational
HA-004222 Marian Nursing Home Split system Mitsubishi MSZ-AP 7185104 Level 2 — office 19 Six-monthly 30 Oct 2026 Scheduled Operational
HA-004124 Fairfield Council Administration Centre AHU Air Change AHU 3375933 Roof #4 Quarterly 31 Oct 2026 Scheduled Operational
HA-004158 Burwood RSL Kitchen exhaust fan FBA S1000-SWSI-630-AL FBA-22-0182 Carpark B1 Quarterly 31 Oct 2026 Scheduled Operational
HA-004233 Royal Rehab Ryde AHU Air Change AHU 8887039 Roof #4 Quarterly 31 Oct 2026 Scheduled Operational
HA-004366 Junction Fair Package unit Temperzone OPA 960 5578391 Plant room 1 Quarterly 31 Oct 2026 Scheduled Operational
HA-004178 Fox Hills Clubhouse Split system Daikin FTXV 5338926 Level 1 — office 3 Six-monthly 01 Nov 2026 Scheduled Operational
HA-004278 75 Castlereagh St AHU Air Change AHU 1636340 Plant room 1 Quarterly 01 Nov 2026 Scheduled Operational
HA-004119 Fairfield Council Administration Centre Chiller Daikin EWAD-TZ 4133222 Plantroom #1 Monthly 02 Nov 2026 Scheduled Operational
HA-004229 Royal Rehab Ryde Chiller Daikin EWWD-VZ 8428901 Plantroom Monthly 02 Nov 2026 Scheduled Operational
HA-004292 20 Smith St Parramatta AHU Air Change AHU 3575855 Mezzanine #5 Quarterly 02 Nov 2026 Scheduled Operational
HA-004201 Ettalong Diggers Fan coil unit Daikin FXFQ 1931550 Level 2 — office 16 Six-monthly 04 Nov 2026 Scheduled Operational
HA-004240 Mega Mall Auburn AHU Harvey custom AHU 2856589 Roof #2 Quarterly 04 Nov 2026 Scheduled Operational
HA-004283 75 Castlereagh St AHU Air Change AHU 7582616 Mezzanine #9 Quarterly 06 Nov 2026 Scheduled Operational
HA-004230 Royal Rehab Ryde AHU Air Change AHU 7428683 Plant room 1 Quarterly 07 Nov 2026 Scheduled Operational
HA-004218 Marian Nursing Home Split system Mitsubishi MSZ-AP 7552263 Meeting room 2 Six-monthly 08 Nov 2026 Scheduled Operational
HA-004226 Marian Nursing Home Split system Mitsubishi MSZ-AP 2158986 Meeting room 1 Six-monthly 08 Nov 2026 Scheduled Operational
HA-004365 Junction Fair Package unit Temperzone OPA 960 4992693 Plant room 1 Quarterly 08 Nov 2026 Scheduled Operational
HA-004288 20 Smith St Parramatta AHU Air Change AHU 9210433 Plant room 1 Quarterly 09 Nov 2026 Scheduled Operational
HA-004312 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 3926704 Wing A room 24 Annual 09 Nov 2026 Scheduled Operational
HA-004261 Piccadilly Tower L15–17 Supplementary DX (comms) Daikin FTXM 4769919 Roof #1 Quarterly 10 Nov 2026 Scheduled Operational
HA-004271 Erskine Park Bakery Oven extract fan FBA S1000-SWSI-560-AL FBA-18-0760 Level 2 plant #2 Quarterly 10 Nov 2026 Scheduled Operational
HA-004153 Burwood RSL AHU Harvey custom AHU 2296806 Mezzanine #2 Quarterly 11 Nov 2026 Scheduled Operational
HA-004157 Burwood RSL AHU Harvey custom AHU 6993031 Mezzanine #6 Quarterly 11 Nov 2026 Scheduled Operational
HA-004266 Erskine Park Bakery Process exhaust fan FBA MEX-710 FBA-23-0897 Roof — north #4 Quarterly 11 Nov 2026 Scheduled Operational
HA-004145 Fairfield Council Administration Centre Exhaust fan FBA ILC-450 FBA-20-0103 Carpark B1 Six-monthly 12 Nov 2026 Scheduled Operational
HA-004345 Bupa Baulkham Hills Hot water plant Rheem commercial 2365161 Plant room 1 Six-monthly 12 Nov 2026 Scheduled Operational
HA-004205 Ettalong Diggers Exhaust fan FBA ILC-450 FBA-17-0292 Roof — north #2 Six-monthly 14 Nov 2026 Scheduled Operational
HA-004220 Marian Nursing Home Split system Mitsubishi MSZ-AP 1778019 Level 1 — office 17 Six-monthly 15 Nov 2026 Scheduled Operational
HA-004242 Mega Mall Auburn AHU Harvey custom AHU 7148840 Mezzanine #4 Quarterly 15 Nov 2026 Scheduled Operational
HA-004279 75 Castlereagh St AHU Air Change AHU 5507469 Level 2 plant #5 Quarterly 15 Nov 2026 Scheduled Operational
HA-004225 Marian Nursing Home Split system Mitsubishi MSZ-AP 5757478 Room 3 Six-monthly 16 Nov 2026 Scheduled Operational
HA-004264 Erskine Park Bakery Process exhaust fan FBA MEX-710 FBA-19-0790 Roof — north #2 Quarterly 16 Nov 2026 Scheduled Operational
HA-004300 Parramatta South — Building EA Fume cupboard exhaust FBA S1000-SWSI-450-AL FBA-21-0027 Carpark B1 Quarterly 16 Nov 2026 Scheduled Operational
HA-004184 Seven Hills RSL Package unit Temperzone OPA 1200 1908493 Roof #4 Quarterly 17 Nov 2026 Scheduled Operational
HA-004244 Mega Mall Auburn AHU Harvey custom AHU 8944849 Mezzanine #6 Quarterly 17 Nov 2026 Scheduled Operational
HA-004155 Burwood RSL AHU Harvey custom AHU 6116936 Mezzanine #4 Quarterly 18 Nov 2026 Scheduled Operational
HA-004361 Glendale Shopping Centre AHU Air Change AHU 1253356 Roof #4 Quarterly 18 Nov 2026 Scheduled Operational
HA-004378 Wests New Lambton Kitchen exhaust fan FBA ILC-630 FBA-17-0377 Plant deck #2 Quarterly 18 Nov 2026 Scheduled Operational
HA-004186 Seven Hills RSL Kitchen exhaust fan FBA ILC-630 FBA-17-0876 Plant deck #2 Quarterly 19 Nov 2026 Scheduled Operational
HA-004232 Royal Rehab Ryde AHU Air Change AHU 6546951 Mezzanine #3 Quarterly 19 Nov 2026 Scheduled Operational
HA-004121 Fairfield Council Administration Centre AHU Air Change AHU 3149456 Mezzanine #1 Quarterly 20 Nov 2026 Scheduled Operational
HA-004200 Ettalong Diggers Fan coil unit Daikin FXFQ 2152696 Level 2 — office 7 Six-monthly 21 Nov 2026 Scheduled Operational
HA-004207 Marian Nursing Home Split system Mitsubishi MSZ-AP 7340061 Level 2 — office 20 Six-monthly 21 Nov 2026 Scheduled Operational
HA-004324 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 4565101 Wing A room 20 Annual 22 Nov 2026 Scheduled Operational
HA-004104 Fairfield Leisure Centre Pool hall exhaust fan FBA S1000-SWSI-800-AL FBA-20-0628 Roof #1 Six-monthly 23 Nov 2026 Scheduled Operational
HA-004173 Fox Hills Clubhouse Package unit Temperzone OPA 960 1154130 Plant room 1 Quarterly 24 Nov 2026 Scheduled Operational
HA-004284 75 Castlereagh St AHU Air Change AHU 4218409 Roof #10 Quarterly 24 Nov 2026 Scheduled Operational
HA-004103 Fairfield Leisure Centre AHU Harvey custom AHU 3256194 Level 2 plant #3 Quarterly 25 Nov 2026 Scheduled Operational
HA-004367 Junction Fair Package unit Temperzone OPA 960 4987445 Mezzanine #3 Quarterly 25 Nov 2026 Scheduled Operational
HA-004275 75 Castlereagh St AHU Air Change AHU 2792449 Mezzanine #1 Quarterly 26 Nov 2026 Scheduled Operational
HA-004295 Parramatta South — Building EA AHU Air Change AHU 4058132 Level 2 plant #1 Quarterly 26 Nov 2026 Scheduled Operational
HA-004358 Glendale Shopping Centre AHU Air Change AHU 7950946 Mezzanine #1 Quarterly 26 Nov 2026 Scheduled Operational
HA-004159 Burwood RSL Kitchen exhaust fan FBA S1000-SWSI-630-AL FBA-19-0777 Carpark B1 Quarterly 27 Nov 2026 Scheduled Operational
HA-004311 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 8324231 Wing B room 21 Annual 28 Nov 2026 Scheduled Operational
HA-004377 Wests New Lambton Kitchen exhaust fan FBA ILC-630 FBA-18-0341 Plant deck #1 Quarterly 28 Nov 2026 Scheduled Operational
HA-004147 Whitlam Library Cabramatta Package unit Temperzone OPA 450 2647673 Mezzanine #2 Quarterly 01 Dec 2026 Scheduled Operational
HA-004289 20 Smith St Parramatta AHU Air Change AHU 9583309 Mezzanine #2 Quarterly 01 Dec 2026 Scheduled Operational
HA-004372 Wests New Lambton Package unit Temperzone OPA 1200 5130039 Mezzanine #1 Quarterly 02 Dec 2026 Scheduled Operational
HA-004379 Northmead Gardens Backflow prevention device Zurn Wilkins RPZ 3991678 Fire service #1 Annual 02 Dec 2026 Scheduled Operational
HA-004101 Fairfield Leisure Centre AHU Harvey custom AHU 9354210 Plant room 1 Quarterly 03 Dec 2026 Scheduled Operational
HA-004127 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 8780559 Meeting room 10 Six-monthly 03 Dec 2026 Scheduled Operational
HA-004146 Whitlam Library Cabramatta Package unit Temperzone OPA 450 7509964 Level 2 plant #1 Quarterly 03 Dec 2026 Scheduled Operational
HA-004281 75 Castlereagh St AHU Air Change AHU 6771368 Level 2 plant #7 Quarterly 03 Dec 2026 Scheduled Operational
HA-004306 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 5347359 Room 28 Annual 04 Dec 2026 Scheduled Operational
HA-004122 Fairfield Council Administration Centre AHU Air Change AHU 3474797 Roof #2 Quarterly 05 Dec 2026 Scheduled Operational
HA-004182 Seven Hills RSL Package unit Temperzone OPA 1200 4137366 Level 2 plant #2 Quarterly 05 Dec 2026 Scheduled Operational
HA-004105 Fairfield Leisure Centre Pool hall exhaust fan FBA S1000-SWSI-800-AL FBA-16-0127 Roof — north #2 Six-monthly 06 Dec 2026 Scheduled Operational
HA-004208 Marian Nursing Home Split system Mitsubishi MSZ-AP 4623812 Level 2 — office 10 Six-monthly 06 Dec 2026 Scheduled Operational
HA-004152 Burwood RSL AHU Harvey custom AHU 4996380 Roof #1 Quarterly 07 Dec 2026 Scheduled Operational
HA-004267 Erskine Park Bakery Package unit Temperzone OPA 1500 8935235 Level 2 plant #1 Quarterly 07 Dec 2026 Scheduled Operational
HA-004290 20 Smith St Parramatta AHU Air Change AHU 6288210 Mezzanine #3 Quarterly 07 Dec 2026 Scheduled Operational
HA-004172 Fox Hills Clubhouse Package unit Temperzone OPA 960 1974921 Plant room 1 Quarterly 09 Dec 2026 Scheduled Operational
HA-004354 Meals Plus & Hope Hostel Thermostatic mixing valve Enware Aquablend 6951503 Wing A room 43 Annual 09 Dec 2026 Scheduled Operational
HA-004111 Cabravale Leisure Centre Package unit Temperzone OPA 590 3797574 Plant room 1 Quarterly 10 Dec 2026 Scheduled Operational
HA-004243 Mega Mall Auburn AHU Harvey custom AHU 6395699 Plant room 1 Quarterly 10 Dec 2026 Scheduled Operational
HA-004317 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 1379110 Ensuite 48 Annual 10 Dec 2026 Scheduled Operational
HA-004360 Glendale Shopping Centre AHU Air Change AHU 9750663 Level 2 plant #3 Quarterly 10 Dec 2026 Scheduled Operational
HA-004134 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 7373845 Level 1 — office 5 Six-monthly 11 Dec 2026 Scheduled Operational
HA-004183 Seven Hills RSL Package unit Temperzone OPA 1200 5301042 Roof #3 Quarterly 11 Dec 2026 Scheduled Operational
HA-004138 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 9374439 Level 2 — office 2 Six-monthly 12 Dec 2026 Scheduled Operational
HA-004188 Ettalong Diggers VRF condenser Daikin VRV IV RXYQ 3596829 Level 2 plant #2 Quarterly 14 Dec 2026 Scheduled Operational
HA-004254 Stamford Marque Split system (common) Fujitsu ASTG 3830686 Meeting room 7 Six-monthly 14 Dec 2026 Scheduled Operational
HA-004102 Fairfield Leisure Centre AHU Harvey custom AHU 8049321 Mezzanine #2 Quarterly 15 Dec 2026 Scheduled Operational
HA-004301 Parramatta South — Building EA Fume cupboard exhaust FBA S1000-SWSI-450-AL FBA-18-0948 Roof — north #3 Quarterly 15 Dec 2026 Scheduled Operational
HA-004140 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 7724738 Meeting room 4 Six-monthly 17 Dec 2026 Scheduled Operational
HA-004196 Ettalong Diggers Fan coil unit Daikin FXFQ 8864200 Room 10 Six-monthly 18 Dec 2026 Scheduled Operational
HA-004219 Marian Nursing Home Split system Mitsubishi MSZ-AP 8714733 Level 1 — office 13 Six-monthly 18 Dec 2026 Scheduled Operational
HA-004177 Fox Hills Clubhouse Split system Daikin FTXV 6131054 Level 1 — office 7 Six-monthly 19 Dec 2026 Scheduled Operational
HA-004241 Mega Mall Auburn AHU Harvey custom AHU 3691072 Level 2 plant #3 Quarterly 21 Dec 2026 Scheduled Operational
HA-004265 Erskine Park Bakery Process exhaust fan FBA MEX-710 FBA-22-0073 Plant deck #3 Quarterly 21 Dec 2026 Scheduled Operational
HA-004107 Fairfield Leisure Centre Split system Daikin FTXM60 7923281 Level 2 — office 14 Six-monthly 22 Dec 2026 Scheduled Operational
HA-004169 Burwood RSL Fan coil unit Temperzone FCU 7516948 Level 1 — office 11 Six-monthly 22 Dec 2026 Scheduled Operational
HA-004170 Burwood RSL Fan coil unit Temperzone FCU 8680014 Meeting room 1 Six-monthly 22 Dec 2026 Scheduled Operational
HA-004206 Marian Nursing Home Split system Mitsubishi MSZ-AP 2044995 Meeting room 14 Six-monthly 22 Dec 2026 Scheduled Operational
HA-004293 20 Smith St Parramatta AHU Air Change AHU 5460061 Plant room 1 Quarterly 22 Dec 2026 Scheduled Operational
HA-004112 Cabravale Leisure Centre Package unit Temperzone OPA 590 2958716 Level 2 plant #3 Quarterly 23 Dec 2026 Scheduled Fault
HA-004239 Mega Mall Auburn AHU Harvey custom AHU 2910626 Roof #1 Quarterly 24 Dec 2026 Scheduled Operational
HA-004321 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 6023998 Ensuite 17 Annual 24 Dec 2026 Scheduled Operational
HA-004299 Parramatta South — Building EA Fume cupboard exhaust FBA S1000-SWSI-450-AL FBA-19-0776 Roof — north #1 Quarterly 25 Dec 2026 Scheduled Operational
HA-004110 Cabravale Leisure Centre Package unit Temperzone OPA 590 1403645 Roof #1 Quarterly 26 Dec 2026 Scheduled Operational
HA-004212 Marian Nursing Home Split system Mitsubishi MSZ-AP 3038575 Room 15 Six-monthly 26 Dec 2026 Scheduled Operational
HA-004246 Mega Mall Auburn AHU Harvey custom AHU 6306253 Mezzanine #8 Quarterly 27 Dec 2026 Scheduled Operational
HA-004263 Erskine Park Bakery Process exhaust fan FBA MEX-710 FBA-25-0908 Plant deck #1 Quarterly 27 Dec 2026 Scheduled Operational
HA-004296 Parramatta South — Building EA AHU Air Change AHU 3892581 Level 2 plant #2 Quarterly 27 Dec 2026 Scheduled Operational
HA-004270 Erskine Park Bakery Oven extract fan FBA S1000-SWSI-560-AL FBA-15-0368 Level 2 plant #1 Quarterly 29 Dec 2026 Scheduled Operational
HA-004298 Parramatta South — Building EA AHU Air Change AHU 2115075 Level 2 plant #4 Quarterly 29 Dec 2026 Scheduled Operational
HA-004231 Royal Rehab Ryde AHU Air Change AHU 1598833 Mezzanine #2 Quarterly 30 Dec 2026 Scheduled Operational
HA-004374 Wests New Lambton Package unit Temperzone OPA 1200 5588623 Plant room 1 Quarterly 01 Jan 2027 Scheduled Operational
HA-004123 Fairfield Council Administration Centre AHU Air Change AHU 7405777 Level 2 plant #3 Quarterly 02 Jan 2027 Scheduled Operational
HA-004211 Marian Nursing Home Split system Mitsubishi MSZ-AP 9817262 Level 2 — office 10 Six-monthly 02 Jan 2027 Scheduled Operational
HA-004320 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 1259852 Ensuite 2 Annual 02 Jan 2027 Scheduled Operational
HA-004228 Marian Nursing Home Package unit Temperzone OPA 350 1805508 Roof Quarterly 03 Jan 2027 Scheduled Operational
HA-004280 75 Castlereagh St AHU Air Change AHU 7055961 Level 2 plant #6 Quarterly 03 Jan 2027 Scheduled Operational
HA-004133 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 7511244 Level 1 — office 3 Six-monthly 05 Jan 2027 Scheduled Operational
HA-004346 Meals Plus & Hope Hostel Thermostatic mixing valve Enware Aquablend 1425017 Wing A room 10 Annual 06 Jan 2027 Scheduled Operational
HA-004216 Marian Nursing Home Split system Mitsubishi MSZ-AP 7945302 Room 8 Six-monthly 09 Jan 2027 Scheduled Operational
HA-004129 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 4625618 Meeting room 5 Six-monthly 12 Jan 2027 Scheduled Operational
HA-004168 Burwood RSL Fan coil unit Temperzone FCU 4153439 Level 1 — office 10 Six-monthly 13 Jan 2027 Scheduled Operational
HA-004249 Mega Mall Auburn Carpark exhaust fan FBA S1000-DWDI-900 FBA-24-0236 Plant deck #3 Six-monthly 13 Jan 2027 Scheduled Operational
HA-004132 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 1596482 Level 1 — office 16 Six-monthly 15 Jan 2027 Scheduled Operational
HA-004142 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 8034779 Level 2 — office 7 Six-monthly 15 Jan 2027 Scheduled Operational
HA-004221 Marian Nursing Home Split system Mitsubishi MSZ-AP 1604652 Room 19 Six-monthly 15 Jan 2027 Scheduled Operational
HA-004350 Meals Plus & Hope Hostel Thermostatic mixing valve Enware Aquablend 9359149 Ensuite 47 Annual 15 Jan 2027 Scheduled Operational
HA-004248 Mega Mall Auburn Carpark exhaust fan FBA S1000-DWDI-900 FBA-17-0340 Carpark B1 Six-monthly 18 Jan 2027 Scheduled Operational
HA-004349 Meals Plus & Hope Hostel Thermostatic mixing valve Enware Aquablend 3005573 Wing A room 39 Annual 19 Jan 2027 Scheduled Operational
HA-004166 Burwood RSL Fan coil unit Temperzone FCU 5364438 Meeting room 20 Six-monthly 20 Jan 2027 Scheduled Operational
HA-004332 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 1957815 Wing B room 16 Annual 20 Jan 2027 Scheduled Operational
HA-004202 Ettalong Diggers Fan coil unit Daikin FXFQ 9299169 Level 1 — office 5 Six-monthly 24 Jan 2027 Scheduled Operational
HA-004363 Glendale Shopping Centre Carpark exhaust fan FBA S1000-SWSI-800-AL FBA-18-0955 Carpark B1 Six-monthly 24 Jan 2027 Scheduled Operational
HA-004143 Fairfield Council Administration Centre Exhaust fan FBA ILC-450 FBA-21-0297 Roof #1 Six-monthly 25 Jan 2027 Scheduled Operational
HA-004326 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 8589882 Room 5 Annual 26 Jan 2027 Scheduled Operational
HA-004128 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 2119491 Level 1 — office 3 Six-monthly 29 Jan 2027 Scheduled Operational
HA-004167 Burwood RSL Fan coil unit Temperzone FCU 5857469 Room 1 Six-monthly 29 Jan 2027 Scheduled Operational
HA-004334 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 3580219 Ensuite 14 Annual 30 Jan 2027 Scheduled Operational
HA-004130 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 2274086 Room 11 Six-monthly 31 Jan 2027 Scheduled Operational
HA-004197 Ettalong Diggers Fan coil unit Daikin FXFQ 2030222 Level 1 — office 11 Six-monthly 31 Jan 2027 Scheduled Operational
HA-004125 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 5656074 Level 1 — office 14 Six-monthly 01 Feb 2027 Scheduled Operational
HA-004176 Fox Hills Clubhouse Split system Daikin FTXV 6332727 Room 17 Six-monthly 03 Feb 2027 Scheduled Operational
HA-004250 Mega Mall Auburn Carpark exhaust fan FBA S1000-DWDI-900 FBA-17-0113 Roof — north #4 Six-monthly 03 Feb 2027 Scheduled Operational
HA-004381 Northmead Gardens Sewer pump station Grundfos SEG 4538149 Roof Six-monthly 03 Feb 2027 Scheduled Operational
HA-004341 Bupa Baulkham Hills Backflow prevention device Zurn Wilkins RPZ 8112121 Fire service #2 Annual 07 Feb 2027 Scheduled Operational
HA-004252 Stamford Marque Carpark exhaust fan FBA S1000-SWSI-710-AL FBA-25-0824 Plant deck #2 Six-monthly 08 Feb 2027 Scheduled Operational
HA-004344 Bupa Baulkham Hills Hot water plant Rheem commercial 9663509 Level 2 plant #1 Six-monthly 08 Feb 2027 Scheduled Operational
HA-004223 Marian Nursing Home Split system Mitsubishi MSZ-AP 1037565 Level 1 — office 4 Six-monthly 09 Feb 2027 Scheduled Operational
HA-004204 Ettalong Diggers Exhaust fan FBA ILC-450 FBA-21-0688 Plant deck #1 Six-monthly 11 Feb 2027 Scheduled Operational
HA-004109 Fairfield Leisure Centre Split system Daikin FTXM60 4196539 Meeting room 1 Six-monthly 13 Feb 2027 Scheduled Operational
HA-004108 Fairfield Leisure Centre Split system Daikin FTXM60 8976219 Meeting room 15 Six-monthly 16 Feb 2027 Scheduled Operational
HA-004165 Burwood RSL Fan coil unit Temperzone FCU 3572081 Level 2 — office 15 Six-monthly 17 Feb 2027 Scheduled Operational
HA-004106 Fairfield Leisure Centre Split system Daikin FTXM60 2416353 Level 1 — office 3 Six-monthly 18 Feb 2027 Scheduled Operational
HA-004171 Burwood RSL Fan coil unit Temperzone FCU 6315518 Meeting room 12 Six-monthly 19 Feb 2027 Scheduled Operational
HA-004113 Cabravale Leisure Centre Exhaust fan FBA ILC-500 FBA-23-0254 Roof #1 Six-monthly 21 Feb 2027 Scheduled Operational
HA-004227 Marian Nursing Home Split system Mitsubishi MSZ-AP 1738836 Level 2 — office 18 Six-monthly 22 Feb 2027 Scheduled Operational
HA-004192 Ettalong Diggers Fan coil unit Daikin FXFQ 7271611 Room 8 Six-monthly 23 Feb 2027 Scheduled Operational
HA-004351 Meals Plus & Hope Hostel Thermostatic mixing valve Enware Aquablend 4766163 Room 29 Annual 23 Feb 2027 Scheduled Operational
HA-004137 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 7884794 Level 2 — office 5 Six-monthly 24 Feb 2027 Scheduled Operational
HA-004148 Whitlam Library Cabramatta Exhaust fan FBA ILC-400 FBA-17-0921 Roof Six-monthly 25 Feb 2027 Scheduled Operational
HA-004139 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 3778757 Meeting room 17 Six-monthly 26 Feb 2027 Scheduled Operational
HA-004203 Ettalong Diggers Fan coil unit Daikin FXFQ 3969870 Meeting room 12 Six-monthly 27 Feb 2027 Scheduled Operational
HA-004323 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 2341480 Ensuite 4 Annual 27 Feb 2027 Scheduled Operational
HA-004141 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 1386233 Level 2 — office 9 Six-monthly 28 Feb 2027 Scheduled Operational
HA-004191 Ettalong Diggers Fan coil unit Daikin FXFQ 2998457 Level 2 — office 15 Six-monthly 01 Mar 2027 Scheduled Operational
HA-004160 Burwood RSL Fan coil unit Temperzone FCU 1763049 Level 2 — office 17 Six-monthly 03 Mar 2027 Scheduled Operational
HA-004251 Stamford Marque Carpark exhaust fan FBA S1000-SWSI-710-AL FBA-24-0136 Roof #1 Six-monthly 03 Mar 2027 Scheduled Operational
HA-004190 Ettalong Diggers Fan coil unit Daikin FXFQ 6963700 Room 2 Six-monthly 04 Mar 2027 Scheduled Operational
HA-004114 Cabravale Leisure Centre Exhaust fan FBA ILC-500 FBA-22-0702 Plant deck #2 Six-monthly 05 Mar 2027 Scheduled Operational
HA-004371 Junction Fair Exhaust fan FBA ILC-500 FBA-19-0212 Plant deck #3 Six-monthly 05 Mar 2027 Scheduled Operational
HA-004364 Glendale Shopping Centre Carpark exhaust fan FBA S1000-SWSI-800-AL FBA-24-0815 Roof — north #2 Six-monthly 06 Mar 2027 Scheduled Operational
HA-004256 Waldorf Pennant Hills Carpark exhaust fan FBA S1000-SWSI-630-AL FBA-15-0149 Roof Six-monthly 07 Mar 2027 Scheduled Operational
HA-004331 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 2919655 Ensuite 24 Annual 07 Mar 2027 Scheduled Operational
HA-004136 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 5820561 Room 16 Six-monthly 08 Mar 2027 Scheduled Operational
HA-004369 Junction Fair Exhaust fan FBA ILC-500 FBA-22-0085 Plant deck #1 Six-monthly 08 Mar 2027 Scheduled Operational
HA-004131 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 6127722 Level 1 — office 20 Six-monthly 09 Mar 2027 Scheduled Operational
HA-004209 Marian Nursing Home Split system Mitsubishi MSZ-AP 2361197 Level 2 — office 3 Six-monthly 10 Mar 2027 Scheduled Operational
HA-004179 Fox Hills Clubhouse Split system Daikin FTXV 1990207 Meeting room 12 Six-monthly 12 Mar 2027 Scheduled Operational
HA-004144 Fairfield Council Administration Centre Exhaust fan FBA ILC-450 FBA-20-0082 Plant deck #2 Six-monthly 13 Mar 2027 Scheduled Operational
HA-004313 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 7613097 Wing B room 39 Annual 13 Mar 2027 Scheduled Operational
HA-004193 Ettalong Diggers Fan coil unit Daikin FXFQ 7330446 Level 1 — office 17 Six-monthly 15 Mar 2027 Scheduled Operational
HA-004336 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 4694338 Room 33 Annual 18 Mar 2027 Scheduled Operational
HA-004195 Ettalong Diggers Fan coil unit Daikin FXFQ 2764055 Level 2 — office 8 Six-monthly 19 Mar 2027 Scheduled Operational
HA-004257 Waldorf Pennant Hills Garbage room exhaust FBA ILC-400 FBA-21-0516 Carpark B1 Six-monthly 19 Mar 2027 Scheduled Operational
HA-004115 Cabravale Leisure Centre Exhaust fan FBA ILC-500 FBA-16-0902 Roof #3 Six-monthly 20 Mar 2027 Scheduled Operational
HA-004224 Marian Nursing Home Split system Mitsubishi MSZ-AP 9197185 Level 2 — office 12 Six-monthly 23 Mar 2027 Scheduled Operational
HA-004315 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 6330325 Wing B room 24 Annual 24 Mar 2027 Scheduled Operational
HA-004164 Burwood RSL Fan coil unit Temperzone FCU 9997348 Meeting room 20 Six-monthly 25 Mar 2027 Scheduled Operational
HA-004215 Marian Nursing Home Split system Mitsubishi MSZ-AP 7190378 Level 1 — office 1 Six-monthly 25 Mar 2027 Scheduled Operational
HA-004199 Ettalong Diggers Fan coil unit Daikin FXFQ 4135647 Meeting room 15 Six-monthly 27 Mar 2027 Scheduled Operational
HA-004135 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 2223775 Level 2 — office 19 Six-monthly 30 Mar 2027 Scheduled Operational
HA-004370 Junction Fair Exhaust fan FBA ILC-500 FBA-20-0270 Plant deck #2 Six-monthly 30 Mar 2027 Scheduled Operational
HA-004314 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 9004787 Wing A room 45 Annual 31 Mar 2027 Scheduled Operational
HA-004126 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 9881978 Level 2 — office 15 Six-monthly 01 Apr 2027 Scheduled Operational
HA-004319 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 1390164 Ensuite 20 Annual 01 Apr 2027 Scheduled Operational
HA-004162 Burwood RSL Fan coil unit Temperzone FCU 7753699 Level 2 — office 13 Six-monthly 03 Apr 2027 Scheduled Operational
HA-004328 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 9108370 Ensuite 21 Annual 04 Apr 2027 Scheduled Operational
HA-004325 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 6531777 Ensuite 20 Annual 05 Apr 2027 Scheduled Operational
HA-004353 Meals Plus & Hope Hostel Thermostatic mixing valve Enware Aquablend 4303412 Room 20 Annual 07 Apr 2027 Scheduled Operational
HA-004330 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 9981497 Wing A room 2 Annual 10 Apr 2027 Scheduled Operational
HA-004309 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 1431254 Ensuite 3 Annual 11 Apr 2027 Scheduled Operational
HA-004340 Bupa Baulkham Hills Backflow prevention device Zurn Wilkins RPZ 3808795 Kitchen #1 Annual 14 Apr 2027 Scheduled Operational
HA-004348 Meals Plus & Hope Hostel Thermostatic mixing valve Enware Aquablend 6297067 Ensuite 27 Annual 15 Apr 2027 Scheduled Operational
HA-004327 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 8611556 Wing B room 19 Annual 28 Apr 2027 Scheduled Operational
HA-004308 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 2752522 Room 2 Annual 15 May 2027 Scheduled Operational
HA-004333 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 7554333 Room 25 Annual 15 May 2027 Scheduled Operational
HA-004337 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 9135335 Ensuite 4 Annual 24 May 2027 Scheduled Operational
HA-004316 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 2407774 Wing B room 11 Annual 28 May 2027 Scheduled Operational
HA-004318 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 7469734 Wing A room 18 Annual 03 Jun 2027 Scheduled Operational
HA-004339 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 2599609 Room 12 Annual 23 Jun 2027 Scheduled Operational
HA-004305 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 3602422 Wing B room 17 Annual 30 Jun 2027 Scheduled Operational
HA-004355 Meals Plus & Hope Hostel Backflow prevention device Zurn Wilkins DCV 4875878 Irrigation #1 Annual 12 Jul 2027 Scheduled Operational
HA-004322 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 6243110 Wing B room 3 Annual 17 Jul 2027 Scheduled Operational
HA-004342 Bupa Baulkham Hills Backflow prevention device Zurn Wilkins RPZ 2529258 Irrigation #3 Annual 26 Jul 2027 Scheduled Operational
HA-004380 Northmead Gardens Backflow prevention device Zurn Wilkins RPZ 2011997 Kitchen #2 Annual 02 Aug 2027 Scheduled Operational
HA-004347 Meals Plus & Hope Hostel Thermostatic mixing valve Enware Aquablend 5874444 Room 36 Annual 13 Aug 2027 Scheduled Operational
HA-004352 Meals Plus & Hope Hostel Thermostatic mixing valve Enware Aquablend 5399154 Wing A room 37 Annual 26 Aug 2027 Scheduled Operational
HA-004356 Meals Plus & Hope Hostel Backflow prevention device Zurn Wilkins DCV 3673459 Kitchen #2 Annual 09 Sep 2027 Scheduled Operational
HA-004335 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 8342862 Ensuite 39 Annual 24 Sep 2027 Scheduled Operational