HA-004175 Fox Hills Clubhouse Split system Daikin FTXV 8564015 Room 16 Six-monthly 21 Sep 2026 Overdue Operational
HA-004174 Fox Hills Clubhouse Split system Daikin FTXV 9354210 Level 2 — office 2 Six-monthly 25 Sep 2026 Overdue Operational
HA-004151 Burwood RSL Cooling tower BAC VTL 8756936 Plantroom Monthly 28 Sep 2026 Overdue Operational
HA-004237 Mega Mall Auburn Cooling tower BAC — 9928679 Plantroom #1 Monthly 28 Sep 2026 Overdue Operational
HA-004118 Cabravale Leisure Centre Split system Mitsubishi PKA-M100 9480537 Level 1 — office 18 Six-monthly 29 Sep 2026 Overdue Operational
HA-004302 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 6375041 Ensuite 20 Annual 29 Sep 2026 Overdue Operational
HA-004303 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 2109636 Wing A room 37 Annual 29 Sep 2026 Overdue Operational
HA-004304 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 1308293 Wing A room 36 Annual 29 Sep 2026 Overdue Operational
HA-004117 Cabravale Leisure Centre Split system Mitsubishi PKA-M100 6995827 Room 10 Six-monthly 03 Oct 2026 Overdue Operational
HA-004229 Royal Rehab Ryde Chiller Daikin EWWD-VZ 2650048 Plantroom Monthly 09 Oct 2026 Scheduled Operational
HA-004290 20 Smith St Parramatta AHU Air Change AHU 8417445 Roof #3 Quarterly 09 Oct 2026 Scheduled Operational
HA-004122 Fairfield Council Administration Centre AHU Air Change AHU 9044570 Level 2 plant #2 Quarterly 10 Oct 2026 Scheduled Operational
HA-004143 Fairfield Council Administration Centre Exhaust fan FBA ILC-450 FBA-17-0393 Roof — north #1 Six-monthly 10 Oct 2026 Scheduled Operational
HA-004149 Burwood RSL Chiller Carrier 30XA-302 3171250 Plantroom #1 Monthly 11 Oct 2026 Scheduled Monitor
HA-004152 Burwood RSL AHU Harvey custom AHU 5186661 Plant room 1 Quarterly 11 Oct 2026 Scheduled Operational
HA-004266 Erskine Park Bakery Process exhaust fan FBA MEX-710 FBA-19-0039 Plant deck #4 Quarterly 11 Oct 2026 Scheduled Operational
HA-004287 20 Smith St Parramatta Cooling tower Aquacool — 5693795 Plantroom #2 Monthly 11 Oct 2026 Scheduled Operational
HA-004274 75 Castlereagh St Cooling tower Aquacool — 5228358 Plantroom #2 Monthly 12 Oct 2026 Scheduled Operational
HA-004150 Burwood RSL Chiller Carrier 30XA-302 6099858 Plantroom #2 Monthly 13 Oct 2026 Scheduled Operational
HA-004172 Fox Hills Clubhouse Package unit Temperzone OPA 960 5416976 Plant room 1 Quarterly 13 Oct 2026 Scheduled Operational
HA-004231 Royal Rehab Ryde AHU Air Change AHU 7075425 Roof #2 Quarterly 13 Oct 2026 Scheduled Operational
HA-004294 Parramatta South — Building EA Chiller Daikin EWAD 8025418 Plantroom Monthly 14 Oct 2026 Scheduled Operational
HA-004107 Fairfield Leisure Centre Split system Daikin FTXM60 3598175 Level 2 — office 6 Six-monthly 15 Oct 2026 Scheduled Operational
HA-004111 Cabravale Leisure Centre Package unit Temperzone OPA 590 4288934 Roof #2 Quarterly 15 Oct 2026 Scheduled Operational
HA-004257 Waldorf Pennant Hills Garbage room exhaust FBA ILC-400 FBA-15-0576 Roof Six-monthly 15 Oct 2026 Scheduled Operational
HA-004300 Parramatta South — Building EA Fume cupboard exhaust FBA S1000-SWSI-450-AL FBA-21-0873 Roof #2 Quarterly 15 Oct 2026 Scheduled Operational
HA-004301 Parramatta South — Building EA Fume cupboard exhaust FBA S1000-SWSI-450-AL FBA-23-0311 Carpark B1 Quarterly 16 Oct 2026 Scheduled Operational
HA-004115 Cabravale Leisure Centre Exhaust fan FBA ILC-500 FBA-21-0384 Carpark B1 Six-monthly 19 Oct 2026 Scheduled Operational
HA-004158 Burwood RSL Kitchen exhaust fan FBA S1000-SWSI-630-AL FBA-15-0249 Roof #1 Quarterly 19 Oct 2026 Scheduled Operational
HA-004234 Royal Rehab Ryde Hydrotherapy pool exhaust FBA S1000-SWSI-560-AL FBA-15-0693 Plant deck Quarterly 19 Oct 2026 Scheduled Operational
HA-004269 Erskine Park Bakery Package unit Temperzone OPA 1500 4198517 Roof #3 Quarterly 19 Oct 2026 Scheduled Operational
HA-004345 Bupa Baulkham Hills Hot water plant Rheem commercial 1585740 Roof #2 Six-monthly 19 Oct 2026 Scheduled Operational
HA-004349 Meals Plus & Hope Hostel Thermostatic mixing valve Enware Aquablend 8352011 Ensuite 22 Annual 19 Oct 2026 Scheduled Operational
HA-004169 Burwood RSL Fan coil unit Temperzone FCU 3395856 Level 2 — office 16 Six-monthly 20 Oct 2026 Scheduled Operational
HA-004202 Ettalong Diggers Fan coil unit Daikin FXFQ 8147362 Meeting room 3 Six-monthly 20 Oct 2026 Scheduled Operational
HA-004292 20 Smith St Parramatta AHU Air Change AHU 1540731 Mezzanine #5 Quarterly 20 Oct 2026 Scheduled Operational
HA-004110 Cabravale Leisure Centre Package unit Temperzone OPA 590 8485903 Level 2 plant #1 Quarterly 21 Oct 2026 Scheduled Operational
HA-004210 Marian Nursing Home Split system Mitsubishi MSZ-AP 6572773 Level 2 — office 5 Six-monthly 21 Oct 2026 Scheduled Operational
HA-004220 Marian Nursing Home Split system Mitsubishi MSZ-AP 1450022 Room 20 Six-monthly 21 Oct 2026 Scheduled Operational
HA-004243 Mega Mall Auburn AHU Harvey custom AHU 3244591 Roof #5 Quarterly 21 Oct 2026 Scheduled Operational
HA-004298 Parramatta South — Building EA AHU Air Change AHU 8121489 Plant room 1 Quarterly 21 Oct 2026 Scheduled Operational
HA-004102 Fairfield Leisure Centre AHU Harvey custom AHU 2840511 Roof #2 Quarterly 22 Oct 2026 Scheduled Operational
HA-004322 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 6871476 Room 21 Annual 22 Oct 2026 Scheduled Operational
HA-004230 Royal Rehab Ryde AHU Air Change AHU 4322302 Plant room 1 Quarterly 24 Oct 2026 Scheduled Operational
HA-004296 Parramatta South — Building EA AHU Air Change AHU 1516086 Level 2 plant #2 Quarterly 24 Oct 2026 Scheduled Operational
HA-004101 Fairfield Leisure Centre AHU Harvey custom AHU 4962849 Roof #1 Quarterly 25 Oct 2026 Scheduled Operational
HA-004171 Burwood RSL Fan coil unit Temperzone FCU 9125864 Room 14 Six-monthly 25 Oct 2026 Scheduled Operational
HA-004260 Piccadilly Tower L15–17 Water-cooled packaged unit Temperzone WCP 5969739 Plant room 1 Quarterly 25 Oct 2026 Scheduled Operational
HA-004286 20 Smith St Parramatta Cooling tower Aquacool — 5301831 Plantroom #1 Monthly 25 Oct 2026 Scheduled Operational
HA-004299 Parramatta South — Building EA Fume cupboard exhaust FBA S1000-SWSI-450-AL FBA-17-0446 Roof #1 Quarterly 25 Oct 2026 Scheduled Operational
HA-004273 75 Castlereagh St Cooling tower Aquacool — 2152696 Plantroom #1 Monthly 26 Oct 2026 Scheduled Operational
HA-004124 Fairfield Council Administration Centre AHU Air Change AHU 4363523 Mezzanine #4 Quarterly 27 Oct 2026 Scheduled Operational
HA-004236 Mega Mall Auburn Chiller Carrier 30XW 9370711 Plantroom #2 Monthly 27 Oct 2026 Scheduled Operational
HA-004132 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 9811837 Room 16 Six-monthly 28 Oct 2026 Scheduled Operational
HA-004235 Mega Mall Auburn Chiller Carrier 30XW 3876207 Plantroom #1 Monthly 28 Oct 2026 Scheduled Operational
HA-004289 20 Smith St Parramatta AHU Air Change AHU 3038575 Level 2 plant #2 Quarterly 28 Oct 2026 Scheduled Operational
HA-004103 Fairfield Leisure Centre AHU Harvey custom AHU 8644346 Mezzanine #3 Quarterly 30 Oct 2026 Scheduled Operational
HA-004120 Fairfield Council Administration Centre Chiller Daikin EWAD-TZ 1295105 Plantroom #2 Monthly 30 Oct 2026 Scheduled Operational
HA-004272 75 Castlereagh St Chiller (VSD frictionless) Smardt WC-350 7821966 Plantroom Monthly 31 Oct 2026 Scheduled Operational
HA-004285 20 Smith St Parramatta Chiller (Powerpax) Powerpax centrifugal 1268939 Plantroom Monthly 31 Oct 2026 Scheduled Operational
HA-004100 Fairfield Leisure Centre Chiller Carrier 30RB-262 8569760 Plantroom Monthly 02 Nov 2026 Scheduled Operational
HA-004295 Parramatta South — Building EA AHU Air Change AHU 4078375 Roof #1 Quarterly 02 Nov 2026 Scheduled Operational
HA-004119 Fairfield Council Administration Centre Chiller Daikin EWAD-TZ 9432762 Plantroom #1 Monthly 03 Nov 2026 Scheduled Operational
HA-004187 Ettalong Diggers VRF condenser Daikin VRV IV RXYQ 1788197 Plant room 1 Quarterly 03 Nov 2026 Scheduled Operational
HA-004238 Mega Mall Auburn Cooling tower BAC — 4302982 Plantroom #2 Monthly 03 Nov 2026 Scheduled Operational
HA-004283 75 Castlereagh St AHU Air Change AHU 7054347 Level 2 plant #9 Quarterly 03 Nov 2026 Scheduled Operational
HA-004141 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 6323600 Level 1 — office 17 Six-monthly 04 Nov 2026 Scheduled Operational
HA-004279 75 Castlereagh St AHU Air Change AHU 3768807 Mezzanine #5 Quarterly 04 Nov 2026 Scheduled Operational
HA-004268 Erskine Park Bakery Package unit Temperzone OPA 1500 8786723 Level 2 plant #2 Quarterly 05 Nov 2026 Scheduled Operational
HA-004351 Meals Plus & Hope Hostel Thermostatic mixing valve Enware Aquablend 4252766 Wing B room 6 Annual 05 Nov 2026 Scheduled Operational
HA-004297 Parramatta South — Building EA AHU Air Change AHU 2312602 Level 2 plant #3 Quarterly 06 Nov 2026 Scheduled Operational
HA-004355 Meals Plus & Hope Hostel Backflow prevention device Zurn Wilkins DCV 7677681 Fire service #1 Annual 06 Nov 2026 Scheduled Operational
HA-004180 Fox Hills Clubhouse Kitchen exhaust fan FBA ILC-560 FBA-20-0269 Plant deck Quarterly 07 Nov 2026 Scheduled Operational
HA-004333 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 8798025 Ensuite 14 Annual 09 Nov 2026 Scheduled Operational
HA-004121 Fairfield Council Administration Centre AHU Air Change AHU 9567913 Plant room 1 Quarterly 10 Nov 2026 Scheduled Operational
HA-004221 Marian Nursing Home Split system Mitsubishi MSZ-AP 3105381 Level 1 — office 11 Six-monthly 10 Nov 2026 Scheduled Operational
HA-004330 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 8113343 Wing B room 26 Annual 10 Nov 2026 Scheduled Operational
HA-004123 Fairfield Council Administration Centre AHU Air Change AHU 3642776 Mezzanine #3 Quarterly 11 Nov 2026 Scheduled Operational
HA-004135 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 3381757 Level 2 — office 8 Six-monthly 11 Nov 2026 Scheduled Operational
HA-004136 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 1626241 Room 3 Six-monthly 12 Nov 2026 Scheduled Operational
HA-004342 Bupa Baulkham Hills Backflow prevention device Zurn Wilkins RPZ 3834153 Fire service #3 Annual 12 Nov 2026 Scheduled Operational
HA-004242 Mega Mall Auburn AHU Harvey custom AHU 7470672 Level 2 plant #4 Quarterly 13 Nov 2026 Scheduled Operational
HA-004244 Mega Mall Auburn AHU Harvey custom AHU 3287865 Level 2 plant #6 Quarterly 13 Nov 2026 Scheduled Operational
HA-004259 Piccadilly Tower L15–17 Water-cooled packaged unit Temperzone WCP 6741012 Mezzanine #2 Quarterly 13 Nov 2026 Scheduled Operational
HA-004344 Bupa Baulkham Hills Hot water plant Rheem commercial 8806000 Level 2 plant #1 Six-monthly 13 Nov 2026 Scheduled Operational
HA-004241 Mega Mall Auburn AHU Harvey custom AHU 5636707 Plant room 1 Quarterly 14 Nov 2026 Scheduled Operational
HA-004281 75 Castlereagh St AHU Air Change AHU 7007316 Level 2 plant #7 Quarterly 14 Nov 2026 Scheduled Operational
HA-004214 Marian Nursing Home Split system Mitsubishi MSZ-AP 1498813 Meeting room 8 Six-monthly 16 Nov 2026 Scheduled Operational
HA-004346 Meals Plus & Hope Hostel Thermostatic mixing valve Enware Aquablend 4175736 Wing B room 36 Annual 17 Nov 2026 Scheduled Operational
HA-004262 Piccadilly Tower L15–17 Supplementary DX (comms) Daikin FTXM 8145945 Plant room 1 Quarterly 18 Nov 2026 Scheduled Operational
HA-004277 75 Castlereagh St AHU Air Change AHU 3969870 Level 2 plant #3 Quarterly 18 Nov 2026 Scheduled Operational
HA-004127 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 9651900 Room 13 Six-monthly 19 Nov 2026 Scheduled Operational
HA-004209 Marian Nursing Home Split system Mitsubishi MSZ-AP 4913356 Level 1 — office 13 Six-monthly 19 Nov 2026 Scheduled Operational
HA-004309 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 5682185 Ensuite 36 Annual 19 Nov 2026 Scheduled Operational
HA-004270 Erskine Park Bakery Oven extract fan FBA S1000-SWSI-560-AL FBA-19-0922 Plant room 1 Quarterly 20 Nov 2026 Scheduled Operational
HA-004343 Bupa Baulkham Hills Backflow prevention device Zurn Wilkins RPZ 8499236 Fire service #4 Annual 20 Nov 2026 Scheduled Operational
HA-004114 Cabravale Leisure Centre Exhaust fan FBA ILC-500 FBA-18-0570 Plant deck #2 Six-monthly 21 Nov 2026 Scheduled Operational
HA-004212 Marian Nursing Home Split system Mitsubishi MSZ-AP 3655897 Room 5 Six-monthly 22 Nov 2026 Scheduled Operational
HA-004199 Ettalong Diggers Fan coil unit Daikin FXFQ 4218118 Level 2 — office 18 Six-monthly 23 Nov 2026 Scheduled Operational
HA-004224 Marian Nursing Home Split system Mitsubishi MSZ-AP 9568520 Room 16 Six-monthly 23 Nov 2026 Scheduled Operational
HA-004196 Ettalong Diggers Fan coil unit Daikin FXFQ 7798417 Level 2 — office 6 Six-monthly 24 Nov 2026 Scheduled Operational
HA-004284 75 Castlereagh St AHU Air Change AHU 8242456 Roof #10 Quarterly 24 Nov 2026 Scheduled Operational
HA-004288 20 Smith St Parramatta AHU Air Change AHU 6964881 Mezzanine #1 Quarterly 24 Nov 2026 Scheduled Operational
HA-004139 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 1356463 Level 1 — office 6 Six-monthly 25 Nov 2026 Scheduled Operational
HA-004156 Burwood RSL AHU Harvey custom AHU 6162467 Roof #5 Quarterly 25 Nov 2026 Scheduled Operational
HA-004189 Ettalong Diggers VRF condenser Daikin VRV IV RXYQ 5872483 Mezzanine #3 Quarterly 25 Nov 2026 Scheduled Operational
HA-004190 Ettalong Diggers Fan coil unit Daikin FXFQ 1143739 Level 1 — office 15 Six-monthly 25 Nov 2026 Scheduled Operational
HA-004176 Fox Hills Clubhouse Split system Daikin FTXV 7715813 Level 2 — office 6 Six-monthly 26 Nov 2026 Scheduled Operational
HA-004193 Ettalong Diggers Fan coil unit Daikin FXFQ 5562718 Level 1 — office 14 Six-monthly 26 Nov 2026 Scheduled Operational
HA-004327 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 3115117 Wing A room 40 Annual 26 Nov 2026 Scheduled Operational
HA-004341 Bupa Baulkham Hills Backflow prevention device Zurn Wilkins RPZ 4006870 Kitchen #2 Annual 26 Nov 2026 Scheduled Operational
HA-004206 Marian Nursing Home Split system Mitsubishi MSZ-AP 5008542 Level 2 — office 1 Six-monthly 29 Nov 2026 Scheduled Operational
HA-004218 Marian Nursing Home Split system Mitsubishi MSZ-AP 4414032 Meeting room 6 Six-monthly 29 Nov 2026 Scheduled Operational
HA-004253 Stamford Marque Split system (common) Fujitsu ASTG 3377422 Level 1 — office 11 Six-monthly 29 Nov 2026 Scheduled Operational
HA-004112 Cabravale Leisure Centre Package unit Temperzone OPA 590 3154631 Plant room 1 Quarterly 01 Dec 2026 Scheduled Fault
HA-004358 Northmead Gardens Backflow prevention device Zurn Wilkins RPZ 4377015 Irrigation #2 Annual 01 Dec 2026 Scheduled Operational
HA-004173 Fox Hills Clubhouse Package unit Temperzone OPA 960 7573185 Roof #2 Quarterly 04 Dec 2026 Scheduled Operational
HA-004182 Seven Hills RSL Package unit Temperzone OPA 1200 1967144 Plant room 1 Quarterly 04 Dec 2026 Scheduled Operational
HA-004249 Mega Mall Auburn Carpark exhaust fan FBA S1000-DWDI-900 FBA-23-0818 Roof — north #3 Six-monthly 06 Dec 2026 Scheduled Operational
HA-004227 Marian Nursing Home Split system Mitsubishi MSZ-AP 6140984 Meeting room 15 Six-monthly 07 Dec 2026 Scheduled Operational
HA-004147 Whitlam Library Cabramatta Package unit Temperzone OPA 450 2784640 Mezzanine #2 Quarterly 08 Dec 2026 Scheduled Operational
HA-004226 Marian Nursing Home Split system Mitsubishi MSZ-AP 6486090 Meeting room 16 Six-monthly 08 Dec 2026 Scheduled Operational
HA-004320 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 1773159 Wing B room 18 Annual 08 Dec 2026 Scheduled Operational
HA-004246 Mega Mall Auburn AHU Harvey custom AHU 1975992 Roof #8 Quarterly 09 Dec 2026 Scheduled Operational
HA-004278 75 Castlereagh St AHU Air Change AHU 6489079 Mezzanine #4 Quarterly 09 Dec 2026 Scheduled Operational
HA-004280 75 Castlereagh St AHU Air Change AHU 3985719 Roof #6 Quarterly 09 Dec 2026 Scheduled Operational
HA-004184 Seven Hills RSL Package unit Temperzone OPA 1200 3797574 Plant room 1 Quarterly 10 Dec 2026 Scheduled Operational
HA-004335 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 9429909 Wing A room 13 Annual 10 Dec 2026 Scheduled Operational
HA-004161 Burwood RSL Fan coil unit Temperzone FCU 3521584 Room 3 Six-monthly 11 Dec 2026 Scheduled Operational
HA-004159 Burwood RSL Kitchen exhaust fan FBA S1000-SWSI-630-AL FBA-21-0712 Roof #2 Quarterly 12 Dec 2026 Scheduled Operational
HA-004155 Burwood RSL AHU Harvey custom AHU 9130875 Plant room 1 Quarterly 13 Dec 2026 Scheduled Operational
HA-004201 Ettalong Diggers Fan coil unit Daikin FXFQ 1700348 Level 1 — office 9 Six-monthly 14 Dec 2026 Scheduled Operational
HA-004261 Piccadilly Tower L15–17 Supplementary DX (comms) Daikin FTXM 3271702 Mezzanine #1 Quarterly 14 Dec 2026 Scheduled Operational
HA-004276 75 Castlereagh St AHU Air Change AHU 3091179 Mezzanine #2 Quarterly 14 Dec 2026 Scheduled Operational
HA-004258 Piccadilly Tower L15–17 Water-cooled packaged unit Temperzone WCP 2788325 Mezzanine #1 Quarterly 15 Dec 2026 Scheduled Operational
HA-004264 Erskine Park Bakery Process exhaust fan FBA MEX-710 FBA-19-0693 Plant deck #2 Quarterly 15 Dec 2026 Scheduled Operational
HA-004263 Erskine Park Bakery Process exhaust fan FBA MEX-710 FBA-22-0227 Roof — north #1 Quarterly 18 Dec 2026 Scheduled Operational
HA-004109 Fairfield Leisure Centre Split system Daikin FTXM60 1801195 Meeting room 18 Six-monthly 19 Dec 2026 Scheduled Operational
HA-004154 Burwood RSL AHU Harvey custom AHU 7866419 Mezzanine #3 Quarterly 19 Dec 2026 Scheduled Operational
HA-004181 Seven Hills RSL Package unit Temperzone OPA 1200 7087296 Roof #1 Quarterly 19 Dec 2026 Scheduled Operational
HA-004228 Marian Nursing Home Package unit Temperzone OPA 350 4835140 Roof Quarterly 19 Dec 2026 Scheduled Operational
HA-004240 Mega Mall Auburn AHU Harvey custom AHU 4153439 Roof #2 Quarterly 21 Dec 2026 Scheduled Operational
HA-004140 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 3511202 Meeting room 7 Six-monthly 23 Dec 2026 Scheduled Operational
HA-004185 Seven Hills RSL Kitchen exhaust fan FBA ILC-630 FBA-17-0928 Carpark B1 Quarterly 23 Dec 2026 Scheduled Operational
HA-004265 Erskine Park Bakery Process exhaust fan FBA MEX-710 FBA-24-0700 Roof #3 Quarterly 24 Dec 2026 Scheduled Operational
HA-004157 Burwood RSL AHU Harvey custom AHU 8990063 Mezzanine #6 Quarterly 25 Dec 2026 Scheduled Operational
HA-004275 75 Castlereagh St AHU Air Change AHU 4589241 Roof #1 Quarterly 25 Dec 2026 Scheduled Operational
HA-004183 Seven Hills RSL Package unit Temperzone OPA 1200 1403645 Roof #3 Quarterly 26 Dec 2026 Scheduled Operational
HA-004188 Ettalong Diggers VRF condenser Daikin VRV IV RXYQ 1813786 Mezzanine #2 Quarterly 26 Dec 2026 Scheduled Operational
HA-004168 Burwood RSL Fan coil unit Temperzone FCU 4695907 Meeting room 4 Six-monthly 27 Dec 2026 Scheduled Operational
HA-004267 Erskine Park Bakery Package unit Temperzone OPA 1500 4256203 Roof #1 Quarterly 27 Dec 2026 Scheduled Operational
HA-004291 20 Smith St Parramatta AHU Air Change AHU 4702490 Mezzanine #4 Quarterly 27 Dec 2026 Scheduled Operational
HA-004233 Royal Rehab Ryde AHU Air Change AHU 2730075 Mezzanine #4 Quarterly 28 Dec 2026 Scheduled Operational
HA-004271 Erskine Park Bakery Oven extract fan FBA S1000-SWSI-560-AL FBA-21-0058 Roof #2 Quarterly 28 Dec 2026 Scheduled Operational
HA-004282 75 Castlereagh St AHU Air Change AHU 4882667 Mezzanine #8 Quarterly 28 Dec 2026 Scheduled Operational
HA-004186 Seven Hills RSL Kitchen exhaust fan FBA ILC-630 FBA-17-0248 Plant deck #2 Quarterly 29 Dec 2026 Scheduled Operational
HA-004245 Mega Mall Auburn AHU Harvey custom AHU 1899143 Roof #7 Quarterly 29 Dec 2026 Scheduled Operational
HA-004208 Marian Nursing Home Split system Mitsubishi MSZ-AP 4353131 Level 1 — office 5 Six-monthly 30 Dec 2026 Scheduled Operational
HA-004126 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 2799358 Level 1 — office 17 Six-monthly 31 Dec 2026 Scheduled Operational
HA-004153 Burwood RSL AHU Harvey custom AHU 1125776 Level 2 plant #2 Quarterly 31 Dec 2026 Scheduled Operational
HA-004225 Marian Nursing Home Split system Mitsubishi MSZ-AP 5256132 Room 12 Six-monthly 31 Dec 2026 Scheduled Operational
HA-004252 Stamford Marque Carpark exhaust fan FBA S1000-SWSI-710-AL FBA-16-0833 Carpark B1 Six-monthly 31 Dec 2026 Scheduled Operational
HA-004128 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 6275324 Level 2 — office 15 Six-monthly 01 Jan 2027 Scheduled Operational
HA-004146 Whitlam Library Cabramatta Package unit Temperzone OPA 450 5149944 Mezzanine #1 Quarterly 01 Jan 2027 Scheduled Operational
HA-004177 Fox Hills Clubhouse Split system Daikin FTXV 7043377 Meeting room 19 Six-monthly 01 Jan 2027 Scheduled Operational
HA-004293 20 Smith St Parramatta AHU Air Change AHU 8889842 Level 2 plant #6 Quarterly 01 Jan 2027 Scheduled Operational
HA-004232 Royal Rehab Ryde AHU Air Change AHU 6513145 Roof #3 Quarterly 03 Jan 2027 Scheduled Operational
HA-004239 Mega Mall Auburn AHU Harvey custom AHU 1613215 Level 2 plant #1 Quarterly 03 Jan 2027 Scheduled Operational
HA-004129 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 9875273 Meeting room 8 Six-monthly 05 Jan 2027 Scheduled Operational
HA-004248 Mega Mall Auburn Carpark exhaust fan FBA S1000-DWDI-900 FBA-22-0327 Roof — north #2 Six-monthly 05 Jan 2027 Scheduled Operational
HA-004160 Burwood RSL Fan coil unit Temperzone FCU 2612631 Level 1 — office 7 Six-monthly 08 Jan 2027 Scheduled Operational
HA-004254 Stamford Marque Split system (common) Fujitsu ASTG 2166073 Room 7 Six-monthly 08 Jan 2027 Scheduled Operational
HA-004312 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 6531448 Wing A room 12 Annual 11 Jan 2027 Scheduled Operational
HA-004329 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 6540751 Room 16 Annual 12 Jan 2027 Scheduled Operational
HA-004130 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 7021320 Room 10 Six-monthly 13 Jan 2027 Scheduled Operational
HA-004148 Whitlam Library Cabramatta Exhaust fan FBA ILC-400 FBA-25-0434 Roof Six-monthly 15 Jan 2027 Scheduled Operational
HA-004223 Marian Nursing Home Split system Mitsubishi MSZ-AP 9625784 Room 13 Six-monthly 15 Jan 2027 Scheduled Operational
HA-004105 Fairfield Leisure Centre Pool hall exhaust fan FBA S1000-SWSI-800-AL FBA-19-0492 Roof — north #2 Six-monthly 17 Jan 2027 Scheduled Operational
HA-004142 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 1383676 Room 2 Six-monthly 17 Jan 2027 Scheduled Operational
HA-004347 Meals Plus & Hope Hostel Thermostatic mixing valve Enware Aquablend 5457122 Wing B room 35 Annual 21 Jan 2027 Scheduled Operational
HA-004113 Cabravale Leisure Centre Exhaust fan FBA ILC-500 FBA-23-0197 Plant deck #1 Six-monthly 22 Jan 2027 Scheduled Operational
HA-004106 Fairfield Leisure Centre Split system Daikin FTXM60 8984705 Level 2 — office 11 Six-monthly 27 Jan 2027 Scheduled Operational
HA-004166 Burwood RSL Fan coil unit Temperzone FCU 2668772 Room 8 Six-monthly 28 Jan 2027 Scheduled Operational
HA-004162 Burwood RSL Fan coil unit Temperzone FCU 9100273 Meeting room 16 Six-monthly 31 Jan 2027 Scheduled Operational
HA-004255 Stamford Marque Split system (common) Fujitsu ASTG 6547336 Meeting room 7 Six-monthly 02 Feb 2027 Scheduled Operational
HA-004354 Meals Plus & Hope Hostel Thermostatic mixing valve Enware Aquablend 6771368 Room 25 Annual 02 Feb 2027 Scheduled Operational
HA-004250 Mega Mall Auburn Carpark exhaust fan FBA S1000-DWDI-900 FBA-15-0345 Carpark B1 Six-monthly 03 Feb 2027 Scheduled Operational
HA-004356 Meals Plus & Hope Hostel Backflow prevention device Zurn Wilkins DCV 7582616 Irrigation #2 Annual 03 Feb 2027 Scheduled Operational
HA-004191 Ettalong Diggers Fan coil unit Daikin FXFQ 5514840 Meeting room 10 Six-monthly 04 Feb 2027 Scheduled Operational
HA-004359 Northmead Gardens Sewer pump station Grundfos SEG 8386636 Mezzanine Six-monthly 07 Feb 2027 Scheduled Operational
HA-004211 Marian Nursing Home Split system Mitsubishi MSZ-AP 5634651 Level 2 — office 13 Six-monthly 09 Feb 2027 Scheduled Operational
HA-004222 Marian Nursing Home Split system Mitsubishi MSZ-AP 3841074 Meeting room 18 Six-monthly 09 Feb 2027 Scheduled Operational
HA-004308 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 4008599 Ensuite 35 Annual 09 Feb 2027 Scheduled Operational
HA-004195 Ettalong Diggers Fan coil unit Daikin FXFQ 7405777 Level 1 — office 11 Six-monthly 10 Feb 2027 Scheduled Operational
HA-004215 Marian Nursing Home Split system Mitsubishi MSZ-AP 9793188 Level 1 — office 3 Six-monthly 11 Feb 2027 Scheduled Operational
HA-004198 Ettalong Diggers Fan coil unit Daikin FXFQ 5805594 Meeting room 20 Six-monthly 16 Feb 2027 Scheduled Operational
HA-004163 Burwood RSL Fan coil unit Temperzone FCU 1785631 Meeting room 15 Six-monthly 18 Feb 2027 Scheduled Operational
HA-004192 Ettalong Diggers Fan coil unit Daikin FXFQ 4133222 Room 2 Six-monthly 20 Feb 2027 Scheduled Operational
HA-004194 Ettalong Diggers Fan coil unit Daikin FXFQ 5054448 Room 7 Six-monthly 21 Feb 2027 Scheduled Operational
HA-004205 Ettalong Diggers Exhaust fan FBA ILC-450 FBA-22-0121 Roof #2 Six-monthly 22 Feb 2027 Scheduled Operational
HA-004336 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 3252360 Room 21 Annual 22 Feb 2027 Scheduled Operational
HA-004145 Fairfield Council Administration Centre Exhaust fan FBA ILC-450 FBA-23-0797 Carpark B1 Six-monthly 24 Feb 2027 Scheduled Operational
HA-004170 Burwood RSL Fan coil unit Temperzone FCU 8930870 Room 12 Six-monthly 24 Feb 2027 Scheduled Operational
HA-004200 Ettalong Diggers Fan coil unit Daikin FXFQ 6393956 Level 1 — office 3 Six-monthly 24 Feb 2027 Scheduled Operational
HA-004310 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 3993498 Ensuite 36 Annual 24 Feb 2027 Scheduled Operational
HA-004203 Ettalong Diggers Fan coil unit Daikin FXFQ 2723151 Room 12 Six-monthly 25 Feb 2027 Scheduled Operational
HA-004138 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 6107082 Level 2 — office 16 Six-monthly 26 Feb 2027 Scheduled Operational
HA-004219 Marian Nursing Home Split system Mitsubishi MSZ-AP 1385569 Meeting room 5 Six-monthly 03 Mar 2027 Scheduled Operational
HA-004256 Waldorf Pennant Hills Carpark exhaust fan FBA S1000-SWSI-630-AL FBA-20-0109 Carpark B1 Six-monthly 03 Mar 2027 Scheduled Operational
HA-004133 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 7372336 Meeting room 7 Six-monthly 05 Mar 2027 Scheduled Operational
HA-004247 Mega Mall Auburn Carpark exhaust fan FBA S1000-DWDI-900 FBA-22-0507 Plant deck #1 Six-monthly 05 Mar 2027 Scheduled Operational
HA-004321 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 5229065 Wing A room 48 Annual 06 Mar 2027 Scheduled Operational
HA-004108 Fairfield Leisure Centre Split system Daikin FTXM60 1949695 Meeting room 18 Six-monthly 09 Mar 2027 Scheduled Operational
HA-004164 Burwood RSL Fan coil unit Temperzone FCU 5819158 Level 2 — office 12 Six-monthly 09 Mar 2027 Scheduled Operational
HA-004204 Ettalong Diggers Exhaust fan FBA ILC-450 FBA-15-0262 Plant deck #1 Six-monthly 10 Mar 2027 Scheduled Operational
HA-004207 Marian Nursing Home Split system Mitsubishi MSZ-AP 9260601 Level 1 — office 4 Six-monthly 11 Mar 2027 Scheduled Operational
HA-004178 Fox Hills Clubhouse Split system Daikin FTXV 3290462 Level 1 — office 15 Six-monthly 14 Mar 2027 Scheduled Operational
HA-004179 Fox Hills Clubhouse Split system Daikin FTXV 6221319 Level 1 — office 2 Six-monthly 14 Mar 2027 Scheduled Operational
HA-004104 Fairfield Leisure Centre Pool hall exhaust fan FBA S1000-SWSI-800-AL FBA-20-0317 Roof — north #1 Six-monthly 17 Mar 2027 Scheduled Operational
HA-004339 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 8156827 Room 21 Annual 17 Mar 2027 Scheduled Operational
HA-004348 Meals Plus & Hope Hostel Thermostatic mixing valve Enware Aquablend 3125132 Ensuite 30 Annual 17 Mar 2027 Scheduled Operational
HA-004137 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 6966001 Level 1 — office 12 Six-monthly 18 Mar 2027 Scheduled Operational
HA-004318 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 6395699 Room 7 Annual 18 Mar 2027 Scheduled Operational
HA-004217 Marian Nursing Home Split system Mitsubishi MSZ-AP 7596135 Level 2 — office 19 Six-monthly 19 Mar 2027 Scheduled Operational
HA-004165 Burwood RSL Fan coil unit Temperzone FCU 9769511 Level 1 — office 7 Six-monthly 20 Mar 2027 Scheduled Operational
HA-004216 Marian Nursing Home Split system Mitsubishi MSZ-AP 6977380 Level 1 — office 17 Six-monthly 22 Mar 2027 Scheduled Operational
HA-004319 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 1170569 Wing A room 43 Annual 22 Mar 2027 Scheduled Operational
HA-004144 Fairfield Council Administration Centre Exhaust fan FBA ILC-450 FBA-18-0710 Roof #2 Six-monthly 23 Mar 2027 Scheduled Operational
HA-004305 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 8935380 Ensuite 20 Annual 23 Mar 2027 Scheduled Operational
HA-004134 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 3228475 Level 2 — office 4 Six-monthly 25 Mar 2027 Scheduled Operational
HA-004251 Stamford Marque Carpark exhaust fan FBA S1000-SWSI-710-AL FBA-20-0480 Roof #1 Six-monthly 25 Mar 2027 Scheduled Operational
HA-004125 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 2347116 Level 2 — office 9 Six-monthly 26 Mar 2027 Scheduled Operational
HA-004213 Marian Nursing Home Split system Mitsubishi MSZ-AP 5193330 Meeting room 9 Six-monthly 28 Mar 2027 Scheduled Operational
HA-004197 Ettalong Diggers Fan coil unit Daikin FXFQ 2104694 Meeting room 11 Six-monthly 31 Mar 2027 Scheduled Operational
HA-004131 Fairfield Council Administration Centre Fan coil unit Temperzone FCU 2874781 Meeting room 15 Six-monthly 01 Apr 2027 Scheduled Operational
HA-004167 Burwood RSL Fan coil unit Temperzone FCU 5020237 Meeting room 1 Six-monthly 01 Apr 2027 Scheduled Operational
HA-004116 Cabravale Leisure Centre Split system Mitsubishi PKA-M100 3270182 Room 6 Six-monthly 04 Apr 2027 Scheduled Operational
HA-004353 Meals Plus & Hope Hostel Thermostatic mixing valve Enware Aquablend 5820068 Wing A room 1 Annual 07 Apr 2027 Scheduled Operational
HA-004334 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 8053073 Ensuite 40 Annual 13 May 2027 Scheduled Operational
HA-004307 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 8428901 Wing B room 4 Annual 15 May 2027 Scheduled Operational
HA-004306 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 1805508 Ensuite 22 Annual 28 May 2027 Scheduled Operational
HA-004357 Northmead Gardens Backflow prevention device Zurn Wilkins RPZ 7409716 Irrigation #1 Annual 28 May 2027 Scheduled Operational
HA-004323 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 8599981 Ensuite 23 Annual 05 Jun 2027 Scheduled Operational
HA-004316 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 2388464 Ensuite 16 Annual 19 Jun 2027 Scheduled Operational
HA-004317 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 9606635 Room 28 Annual 19 Jun 2027 Scheduled Operational
HA-004328 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 2919733 Wing B room 10 Annual 19 Jun 2027 Scheduled Operational
HA-004337 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 5401352 Ensuite 14 Annual 23 Jun 2027 Scheduled Operational
HA-004324 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 4376309 Wing A room 17 Annual 13 Jul 2027 Scheduled Operational
HA-004311 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 2364805 Wing A room 22 Annual 22 Jul 2027 Scheduled Operational
HA-004352 Meals Plus & Hope Hostel Thermostatic mixing valve Enware Aquablend 6155404 Ensuite 21 Annual 07 Aug 2027 Scheduled Operational
HA-004326 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 6925719 Wing A room 7 Annual 08 Aug 2027 Scheduled Operational
HA-004340 Bupa Baulkham Hills Backflow prevention device Zurn Wilkins RPZ 7410045 Irrigation #1 Annual 08 Aug 2027 Scheduled Operational
HA-004331 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 1479334 Ensuite 11 Annual 10 Aug 2027 Scheduled Operational
HA-004315 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 2492878 Room 11 Annual 21 Aug 2027 Scheduled Operational
HA-004325 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 6119019 Wing B room 15 Annual 27 Aug 2027 Scheduled Operational
HA-004332 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 6664063 Ensuite 35 Annual 31 Aug 2027 Scheduled Operational
HA-004338 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 9242764 Wing A room 44 Annual 04 Sep 2027 Scheduled Operational
HA-004313 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 7327709 Wing B room 22 Annual 12 Sep 2027 Scheduled Operational
HA-004350 Meals Plus & Hope Hostel Thermostatic mixing valve Enware Aquablend 8668603 Wing A room 42 Annual 16 Sep 2027 Scheduled Operational
HA-004314 Bupa Baulkham Hills Thermostatic mixing valve Enware Aquablend 3661138 Wing B room 11 Annual 04 Oct 2027 Scheduled Operational